Archives by date

You are browsing the site archives by date.

Building Operations Weekly: April 28, 2020

UBC Well Being Resources Available to You | COVID Care B.R.A.C.E. yourself | Be Aware of Phishing Scams | Denim Day April 29th | Submit your Bright Ideas | Weekly Tip: How to Prepare for a Pandemic Situation | Current Building Operations’ Job Postings

Energy efficiency and cost savings during COVID-19

With reduced occupancy on the UBC Vancouver campus, building operators and energy managers are adjusting heating or cooling levels in spaces that have reduced or zero occupancy. This is an opportunity to ensure critical energy savings while maintaining a safe and healthy indoor environment.

A friendly reminder to run the cold water taps to ensure water is fresh

As many buildings on campus have reduced occupancy, we want to remind everyone that running the cold water taps until the water is cold is an important step before drinking or using for food preparation. This will ensure the water is kept fresh for use and stagnant water is flushed from the building’s pipe network system.

Recognizing those still working on campus

To help prevent the spread of COVID-19, the majority of faculty and staff are working from home right now. However, teams like Facilities Management at UBC Okanagan and Building Operations’ Custodial Services at UBC Vancouver continue to carry out most of their day-to-day work on campus.

Frank Crudo returns to Building Operations as Senior Manager, Architectural

Frank Crudo returns to Building Operations as Senior Manager, Architectural

We are excited to welcome back Frank, joining Building Operations’ Trades division and leading the architectural trades. As the Senior Manager, Frank will be responsible for the short and long-range planning of building architectural systems and the supervision of staff and consultants.